Manage and connect dependencies across multiple projects by “coding” Inputs/Outputs (or Givers/Receivers) using SSI Multi-Project Tools.

Overview

SSI Tools helps you decompose a large complex project into separate subprojects without losing dependencies that link one project’s outputs to another project’s inputs. Inputs/Outputs (or Givers/Receivers) can be explicitly “coded” using SSI Tools and reconnected automatically. SSI Multi-Project Tools are useful for identifying dependencies between IMS sections and synchronizing local and remote projects.

Features of SSI Multi-Project Tools

A collection of subordinate schedules (subprojects) that are defined by the hierarchy of a Work Breakdown Structure (WBS), Organizational Breakdown Structure (OBS), Integrated Product Team (IPT) Structure, or some other logical structure such as Project Life Cycle, Functional, Financial or Customer Defined. The benefits of using an IMS include the ability to perform a Critical Path Method (CPM) analysis across multiple Work Breakdown Structures and the ability to increase the scope of shared resource management.

A hierarchical decomposition of the Integrated Master Schedule. At times, a subproject can stand alone to allow simultaneous maintenance and updates. Other times subprojects can be inserted into a master plan to facilitate the type of analysis and project perspective described in the IMS section above.

Learn About the Other SSI Tools for Microsoft Project

SSI Tools for Microsoft Project Ribbon
Show All Tasks The SSI Toolbox Schedule Sanitizer Copy/Paste Assignments Exporting Tools SSI QBD Tool Copy/Paste Tasks

Show All Tasks

Click this button to clear all sorting, filters, and groups and expand all levels of the Work Breakdown Structure.

The SSI Toolbox

The toolbox is a collection of useful time saving features anyone who works with Microsoft Project will want. Features such as: Adding common predecessors or successors to selected tasks, adding common prefixes or suffixes to text data, replacing text with different values, making text proper case, etc.

Schedule Sanitizer

The SSI Schedule Sanitizer is a tool built to help users remove nonessential/unnecessary, and/or proprietary data from a Microsoft Project schedule file prior to sending it to an outside organization. Every organization should require Project Schedulers to, at a minimum, remove any proprietary information from a Project file prior to transferring the file to an outside entity. The SSI Schedule Sanitizer makes the process of removing this data quick and easy. The tool allows users to save and distribute sanitization configurations which can be easily applied at any time.

Copy/Paste Assignments

The SSI Copy/Paste Assignments tool enables users to easily copy assignments from one task and paste them to any number of other tasks. Pasting assignments will assign the same resources and remaining work/cost values of the copied task to all selected tasks.

Exporting Tools

The Exporting Tools are built to export data from Microsoft Project schedules into formats readable by other external tools or schedule deliverables

SSI QBD Tool

Quantifiable Backup Data (QBD) is often required on schedules adhering to Earned Value requirements on any tasks that have long baseline durations. Tracking and managing QBD on each task can be quite the hassle, and auditors often want to see a task's accompanying QBD. With the SSI QBD Tools, you will be able to assign, track, and status QBD steps with just a few clicks.

The Enterprise Fields Setup dialog allows users to provide their list of Enterprise Custom Fields to SSI Tools in a one-time setup, which will allow them to pick these fields in SSI Tools controls.

Copy/Paste Tasks

Why are these buttons here and why would someone use them to copy/paste task rows rather than the standard windows copy/paste functions they have become accustomed to? Interestingly, copying and pasting tasks within a project that is saved on a Project Server or Project Online database can cause file corruption issues. To quote this article, "Over time, enterprise projects can become corrupted in either Project Online or Project Server. Although no one knows every cause of project corruption, one of the primary causes has been the process of cutting/copying and pasting entire task rows in the Microsoft Project schedule.".

When an entire task row is cut/copied, all of its Enterprise Custom Field values are also copied. When a paste occurs, the Project Server/Project Online database can mess up how it stores Enterprise Custom Fields for the project, leading to file corruption.

In order to circumvent this issue and help Microsoft Project users who are connected to PWA avoid file corruption, Structured Solutions has created our own Copy/Paste tools. These buttons will allow users to still be able to copy/paste entire task rows without any of the file corruption risk.